Vannitoaremont 24 builds and completely repairs bathrooms in Tallinn and Harju County: dismantles old furnishings, performs plumbing and electrical work, waterproofing and tiling, and installs a new bathtub, sink and toilet bowl under one order. By the end of 2025, 291 bathrooms had been completed in this way: 176 in panel houses instead of cabins and 115 in private houses, wooden houses or stone houses.

The order of work always goes in the same direction: demolition, plumbing and electricity, waterproofing, tiling and then the installation of sanitary ware, because each subsequent layer covers the previous one and the finished surface is not dismantled again.

  • Licensed and insured
  • 100% satisfaction guarantee
  • 291 bathrooms by the end of 2025

Bathroom renovation services

Bathroom construction in apartment buildings and private houses consists of four jobs at Vannitoaremont 24: bathtub installation, electrical work, plumbing work and bathroom renovation of a panel building.

  • Two installers position a white freestanding bath beside a tiled wall. Water cools faster in a steel bath than in an acrylic one.

    Bath Installation

    The installation of the bathtub begins with adjusting the legs according to the level, so that the bathtub does not wobble, and ends with connecting the overflow to the drain pipe and the silicone joint next to the wall.

    Before installation, Vannitoaremont 24 checks whether it sometimes carries a full bathtub and the total weight of a person of 300 kilograms, because it is this load, not an empty bathtub, that tests the old floor.

  • An installer on a ladder fits a light above a round mirror. Bathroom sockets are splash-resistant IP44; 1,236 had been fitted by the end of 2025.

    Bathroom electrical work

    Bathroom electrical work includes installation of lighting, washing machine socket and underfloor heating thermostat, all in accordance with wet room safety zones.

    The electrical system of the bathroom of an old apartment does not meet the modern requirements of a wet room, therefore electrical work is part of the bathroom renovation of an old apartment.

  • An installer removes old wall tiles during a bathroom renovation in a panel building. The bathroom circuit is switched off at the electrical panel first because old wiring runs behind the tiles.

    Panel building bathroom renovation

    Renovation of a bathroom in a panel building means partial or complete replacement of the original finished bathroom block, a Soviet-era sanitary cubicle, because the original blocks of panel houses from the 1960s to the 1980s have long exceeded their lifespan.

    The Vannitoaremont 24 team will connect the new bathroom in the Lasnamäe and Mustamäe series panel houses with the existing cast-iron riser, and we will explain in more detail what this work includes on a separate page.

    View prices and timescales: Panel building bathroom renovation
  • An installer connects water pipes and a waste trap beneath a vanity. Only metal-braided flexible connection hoses are used; 2,583 had been fitted by the end of 2025.

    Bathroom plumbing

    The bathroom plumbing works cover the replacement of faucets, siphons and corner valves and the connection of the water piping to new sanitary equipment using PEX or copper piping with press fittings.

    Vannitoaremont 24 attaches the water connections of the wall faucet to a metal mounting plate before tiling, so that the distance between the two connections is exactly 150 millimetres and the rosettes of the faucet rest tightly against the tiled wall without extensions.

Bathroom renovation prices

The bathroom construction quote takes into account the area of the room and how much of the old plumbing and electricity will be replaced. There is no charge for a site visit and a written quote.

ServicePrice
Overhaul of the bathroom in a panel buildingalates 7480 €
Small bathroom renovationalates 3950 €
Bath installationalates 130 €
Bathroom electrical workalates 650 €
Bathroom plumbingalates 520 €

What affects the price:

  • the size of the room and whether it is the original bathroom block of the panel building
  • whether the electrical and plumbing needs a complete update or only a partial one
  • price range of selected sanitary ware and faucets
  • the bathroom construction fee is divided into three installments: 30 percent on the first business day, 50 percent after tiling and 20 percent after handover inspection
  • The driving cost for each day of work of the Harju County property is the number of kilometers between the city centre office and the property times 0.92 euros

How long does it take to build a bathroom?

A full renovation of a bathroom in a panel building, 4.5 square metres, takes 12 working days from start to handover: 2 days of demolition, 3 days of plumbing and electricity, 2 days of waterproofing with drying time, 3 days of tiling and 2 days of sanitary equipment installation.

When the waterproofing dries, the schedule has its own working days, so the tiler starts with a dried membrane and tiling days do not shift.

Electrical work is done before the waterproofing, because the wires and boxes must remain behind the membrane, not on top of it. A hole cut later in the finished tile and membrane will damage both layers, so the electrician finishes his work before the tiler.

The answer to your enquiry comes within the same working day, and the demolition starts within 15 working days of the agreement. The duration of tiling works ordered as a separate service is stated on the tiling page. 23 bathrooms were completed in 2023, 24 in 2024 and 26 in 2025.

An installer fixes large light-coloured wall tiles. The customer selects the tiles, tap and drain together at the measuring visit so work does not pause for decisions.
An electrician in a dark blue T-shirt fits a junction box near the ceiling from a ladder; orange cable conduits, a mounting plate with two brass connectors and a high window are visible. In this old stone house, a detector checks for hidden pipes before cable channels are cut.

Bathroom renovation in a Tõnismäe stone building

Owner: Leida S., apartment in Tõnismäe settlement. Location: near the Estonian National Library, Tõnismäe district, Kesklinn. Job number: 1663.

Site visit. The surveyor measured the 4.2 square meter bathroom, checked the old ungrounded wiring, and offered a 12 business day schedule.

Demolition, plumbing and electricity. Old tile, plaster and cast iron bath left in 2 days. The electrician placed the lights and sockets according to the EVS-HD 60364-7-701:2024 standard zones, the bathroom electrical circuit got its own fault current protector, and the wall faucet connections were fixed to the metal mounting plate with a 150 mm gap before tiling.

Waterproofing and tiling. The double layer membrane took 2 days with drying, each wall was photographed before tiling and tiling took 3 days.

Plumbing and handover. The load-bearing capacity of the floor slab was checked for a filled bath and a 300-kilogram human weight before the installation of the bath, and the customer's old wooden sink cabinet was painted in the colour of his choice and matched to the new plan.

Repair price: €4,730 including VAT: small bathroom renovation (demolition, plumbing, waterproofing, tiling and sink installation) 1 × €3,950 = €3,950, bathroom electrical work 1 × €650 = €650 and bathtub installation 1 × €130 = €130. Tiles, faucet and sanitary equipment are added to the labor price, and there is no travel cost for the property in the centre.

Duration of repairs: 12 working days in 2024, including demolition 2 days, plumbing and electrical 3 days, waterproofing 2 days, tiling 3 days and sanitaryware installation 2 days.

Finished room: The bathroom was handed over on the 12th business day and its electrical circuit is behind its fault current protection.

How we work

From site visit to handover in three benches.

  1. 1. Site visit and riser inspection

    We measure the space on site, check the condition of the existing plumbing and electricity, and discuss the desired layout. Together with the quote, you receive a day-by-day schedule where demolition, plumbing, electricity, waterproofing, tiling and sanitaryware installation have their own working days. In the panel building, the hatch of the riser is also opened during the measurement, and the condition of the riser is written in the written quote.

  2. 2. Demolition, plumbing and electrical work

    We dismantle the old furnishings, tiles and plaster, and the demolition waste is taken away from the property by a forklift truck in a construction-waste bag. The electrician places the lights and sockets according to the electrical standard zones for the rooms with bath or shower, and each electrical circuit in the bathroom gets a separate fault current protector.

  3. 3. Waterproofing, tiling and handover

    Each wall membrane is photographed before tiling, and the photo set is handed over with a warranty document. In the same warranty document, there is a 3-year warranty for waterproofing, and a 24-month manufacturer's warranty is also valid for sanitary equipment.

Planning your bathroom renovation

The three choices that most affect the final layout and scope of work.

Bath or shower

The bathtub is suitable as a whirlpool for a small child and for families where washing is done while sitting, and the shower room takes up less floor space and is suitable for a hurried morning routine. Changing the bath and shower room in the same drainage area does not require major reconstruction.

Combined bathroom or separate toilet

The toilet bowl in the same room as the bathroom saves space, and in the morning of a large family, this room is a common bottleneck for everyone. The construction of a separate toilet room adds to the amount of work, because it needs its own water supply and the partition has to be built from scratch.

Which existing pipes can stay?

In the bathroom of the panel building, we only change the branch inside the apartment up to the shut-off valve, and the riser remains intact, because it is up to the apartment association. The service life of the branch made of the same galvanized steel as the riser is over, so we will replace it with the rest of the repair, and the old pipe will not remain behind the new tile.

Frequently Asked Questions

In what order will the bathroom construction work take place?

The order is always demolition, plumbing and electricity, waterproofing, tiling and then installation of sanitary equipment. Each work covers the previous one, so that the finished surface is not disassembled again and no duplicate work occurs.

How Big Is a Typical Prefab Bathroom?

A typical bathroom in a panel building is 4.5 square metres. From this area, we calculate the amount of floor screed, membrane and tile, and this is the first number we ask for a quote. The average area of ​​291 renovated bathrooms is 5.8 square metres.

Why Is Electrical Work Done Before Tiling?

Wires and junction boxes must remain visible behind the waterproofing membrane, not on top of it or under the tile. Electrical work done after tiling means cutting the finished tile, which will damage both the tile and the membrane.

What Safety Zones Do Bathroom Electrical Works Follow?

The electrical work in the bathroom complies with the standard EVS-HD 60364-7-701:2024, which divides the space into zones up to a height of 3 metres from the floor and within a radius of 4 metres from the water outlet of the shower or bath. Each electrical circuit in the bathroom also gets a separate fault current protector.

How Much Does a Complete Bathroom Renovation Cost?

The overhaul of a bathroom in a panel building costs from 7,480 euros, a smaller, more partial bathroom renovation from 3,950 euros. The difference comes from how much old plumbing, electrical and bathroom block construction needs to be replaced.

Does the Old Bathroom Furniture Go with the New Plan?

No, because the old sanitary ware and faucets are the same age as the old pipes, and the warranty does not extend to their reuse. The exception is good wooden cabinets, which the team paints in the colour chosen by the customer and matches them to the new plan.

Is the riser the responsibility of the apartment owner or the apartment association?

The quote for the bathroom renovation starts with the shut-off valve of the apartment: after that, the pipe belongs to the apartment owner and the riser is the co-property of the apartment association, the exchange of which is decided by the apartment association.

In which regions do you do bathroom construction?

The work area for the bathroom renovation is the whole of Tallinn, including Lasnamäe and Mustamäe panel houses and Kalamaja and Kadriorg wooden houses, and Maardu, Viimsi, Saue, Keila and Rae parishes in Harju County. By the end of 2025, 203 bathrooms have been repaired in Tallinn and 88 in Harju County.

Request a bathroom renovation quote

Call +372 XXXX XXXX or use the form below to ask about bathroom renovation. Tell us the room size and whether you want a full or partial renovation. We will give the expected number of working days in our first reply and provide a day-by-day schedule with the written quote.

Call our Tallinn city centre office +372 XXXX XXXX
  • Licensed and insured
  • 100% satisfaction guarantee

Please enter your name and either a phone number or an email address.

Call our Tallinn city centre office +372 XXXX XXXX