
#1 bathroom repair company in Tallinn
Bathroom Renovation in Rae Parish
Vannitoaremont 24 performs bathroom repairs, shower room construction, tiling works and toilet repairs in new apartment and townhouses in Peetri, Järveküla and Jüri and private houses in Assaku and Lagedi in Rae municipality.
We reserve the elevator of the Peetri apartment building from the apartment association before the first business day.
- Licensed and insured
- 100% satisfaction guarantee
- 10 kilometers and 18 minutes to Peetri
Request a free site visit

Underfloor heating and linear drains in Peetri bathrooms
In the bathroom floor of Peetri and Järveküla apartments and townhouses, the water floor heating pipe runs 5 centimetres deep in the screed, exactly where the new floor drain or shower wall attachment would like to go. Vannitoaremont 24 attaches the glass shower wall in the bathroom of Rae municipality to the wall profile and the support rod that attaches to the ceiling, so that no holes are drilled in the screed with the heating pipe.
In the newer private houses in Assaku and Jüri, instead of a bathtub, a large floor-level shower area with a linear floor drain is desired, the recess of which must be cut into the screed with heating pipes. Vannitoaremont 24 opens the pit of the drain in the private residence of Rae municipality layer by layer with a chisel, not with a cutting tile, so that the heating pipe running in the screed is visible intact and can be routed past the pit. By the end of 2025, 29 shower areas with linear floor drain will be built in place of underfloor heating in Rae municipality.
Our Services in Rae Municipality
The reason for bathroom renovation in new houses in Rae municipality is the desire for a larger shower or new finish, not old plumbing. Of the 156 works of Rae municipality that were completed by the end of 2025, 71 are in Peetri. The six works below are written according to underfloor heating and the construction of new developments.

Waterproofing
In the bathroom of the new building in Rae municipality, the moisture of the underfloor heating screed is measured before waterproofing, and concrete with more than 2 percent moisture remains dry under heating, because the membrane applied to the wet surface rises as bubbles when the heating starts. In the Vannitoaremont 24 team, the moisture is measured by the team leader, who transfers the result and the measurement location to the floor plan, so that the same measurement can be repeated during the warranty period.

Shower room construction
The construction of the shower room in the new building of Rae parish leads the linear floor drain to the wall, because in this way the floor heating pipe is 10 centimetres away from the floor drain body and the slope falls in one direction. Vannitoaremont 24 shows the customer the direction of the floor drain, heating pipe and slope on the floor plan before the slope construction, so that the customer can confirm the size of the shower area before pouring the concrete.

Bathroom Renovation
The bathroom renovation in the Peetri apartment building begins with the apartment association's rules of procedure, which allows the elevator to be used for transporting building materials only with protective panels and at reserved times. Vannitoaremont 24 installs the plywood protective panels in the elevator of Peetri's apartment building before transporting the first package of tiles and removes them after the last garbage bag.

Tiling works
Tiling work in the bathroom with underfloor heating in Rae municipality is done with flexible S1 class tile adhesive, because the warm levelling layer expands and the rigid adhesive breaks apart from under the tile. Vannitoaremont 24 cuts a separate movement joint under the doorway at the border of the underfloor heating bathroom and the corridor, because the two heating circuits heat up at different speeds and the tile surface without a movement joint cracks at the border.

Toilet Renovation
Renovation of the toilet in the townhouse of Rae municipality brings the wall-hung toilet frame away from the shared wall with the neighbour to an independent frame, because the frame attached to the common wall carries the sound of the flush to the neighbour's room. Vannitoaremont 24 gives the terraced house customer photos of the frame attachment before closing the wall, so the installation can be proven in a noise dispute with a neighbour.

Sauna Construction
The construction of the sauna in the new building of Rae parish takes into account heat recovery with ventilation, because the 90-degree moist air of the sauna is taken out through a separate pipe, not through the heat exchanger of the ventilation unit. Vannitoaremont 24 orders a 15-millimeter profile board made of sawn wood, the moisture content of which has been reduced to 12 percent in the dryer, because the wetter board shrinks with cracks in the heated sauna.
Call us:
- Licensed and insured
- 100% satisfaction guarantee

10 km and 18 minutes to Peetri
Rae municipality does not have to pay for a site visit and a written quote. Each day of work of Peetri's property means a travel cost of 9.20 euros, because it is 10 kilometers from our Tallinn city centre office and the price of a kilometer is 0.92 euros.
In Peetri's apartment building, we unload the tiles and mixes in front of the main entrance and take them up with the elevator with protective panels at the time reserved by the apartment association. The construction-waste bag cannot be left on the lawn of the new development, so we put it in the guest parking lot indicated by the apartment association, and a truck with a forklift will take it away the same day the bag is full.
Frequently Asked Questions
How Much Does Bathroom Renovation Cost in Rae Parish?
A small bathroom renovation in Rae municipality costs from 3,950 euros, the construction of a shower room from 4,200 euros and tiling work from 35 euros per square meter, you do not have to pay for a site visit and a written quote. At the Peetri property, on days of work, an extra 9.20 euros per day will be charged.
Do Special Rules Apply to Repairs in the Peetri Apartment Building?
Yes. The house rules of Peetri's new apartment buildings require an elevator reservation and protective panels and allow noisy works only on weekdays, and we do these works in the apartment building from 9:00 a.m. to 5:00 p.m. Before the first business day, we will send the repair schedule and the contact of the team leader to the board of the apartment association. In Peetri and Järveküla apartment buildings, the elevator has been booked 66 times by the end of 2025.
Does the entire Rae Parish belong to the Service Area?
Yes. our surveyor visits to Peetri, Järveküla, Jüri, Assaku, Lagedi, Vaida and Kurna, both to apartment buildings and terraced houses as well as to private houses. The Peetri property has a daily driving cost of 9.20 euros, and that of the Vaida or Kurna property comes from the number of kilometers driven from the city centre office.
When could bathroom renovation start in Rae Parish?
We will respond to your enquiry within the same working day, and work will start within 15 working days after the quote is confirmed. The developer's underfloor heating diagram should be included with your enquiry for a new development apartment: we can see the location of the heating pipes from it already when preparing the quote.
Request a quote
Planning a shower area in Rae Parish? Call +372 XXXX XXXX to arrange a site visit. Have the developer’s underfloor heating plan ready if you have it.
