Skip to main content
Vannitoaremont 24 logo

#1 bathroom repair company in Tallinn

Completed bathrooms: prices and timelines

  • Licensed and insured
  • 100% satisfaction guarantee
  • 291 bathrooms and 131 saunas by the end of 2025
  • An installer rolls blue waterproofing membrane onto a floor with a drain. The surface is primed first, and membrane application begins once the primer is dry.
  • Vannitoaremont 24's Kesklinn office building. The office offers two possible start weeks, and the customer chooses one.
  • A woman in a green blouse stands at the front of a group on a gravel lot, with a warehouse and ladder-carrying vehicles behind. In 2025, the tilers drilled 1,412 tap and pipe holes in tiles with a diamond core bit to avoid cracking the edges.
  • Vannitoaremont 24 van and enclosed trailer in a yard. By the end of 2025, 1,175 kilograms of white tile adhesive had been used beneath glass mosaic so grey adhesive would not show through.
  • Finished shower room with a glass wall, illuminated niche and linear drain. By the end of 2025, 1,174 square metres of class B tiles with barefoot slip resistance had been laid on shower floors.

Bathrooms from Nõmme to Viimsi

Vannitoaremont 24 shows the location, volume and measurements, price including VAT, working days and year for each completed bathroom. By the end of 2025, 1,888 projects had been completed, among them 291 bathrooms, 283 shower rooms, 219 toilets and 131 saunas, and the number of each work below is from the register of works of the city centre office.

  • Finished bathroom seen from the doorway, with a white-panelled bath, white wall tiles, frosted window and fan grille. The acrylic bath is filled with water while the silicone joint is made so its weight will not pull the cured joint apart.

    Complete renovation of a bathroom with a window in a detached house, Nõmme

    Location: Nõmme, near Tallinn Nõmme High School.

    Job number: 1803, 6 wall photos were given to the customer with a warranty document.

    Volume and dimensions: 4.5 m² windowed bathroom in a detached house built in the 1930s, when Nõmme was an independent city: old tile, bathtub and plaster demolished, galvanized branch replaced with shut-off valve with 16 mm PEX pipe, new 110 mm drain in cast iron riser, double-layer membrane on the floor and walls of the shower area up to 2 metres high, extract ventilation fan with non-return valve.

    Repair price: €4,875 including VAT: small bathroom renovation €3,950, bathroom electrical work €650, bathtub installation €130 and fan replacement with non-return valve €145. The tiles and sanitary equipment chosen by the customer are added to the labor price, and there is no travel cost at the Nõmme site.

    Duration of repairs: 12 working days in 2025, including demolition 2 days, plumbing and electrical 3 days, waterproofing 2 days, tiling 3 days and sanitaryware installation 2 days.

  • Narrow WC with a wall-hung toilet, tiled frame enclosure, square white access hatch, bidet spray and dark floor tiles. The toilet is fitted with the seat 42 centimetres above the floor.

    Wall-hung toilet in a Kallavere apartment, Maardu

    Location: Maardu, Kallavere, near Maardu city hall.

    Job number: 1553, 3 wall photos were given to the customer with a warranty document.

    Volume and dimensions: 80 cm wide separate toilet room, stand behind the toilet in the corner: wall-hung toilet frame in front of the stand, 30 × 30 cm maintenance hatch in the frame cover to the apartment association shut-off valve, tiled floor and frame cover, bidet shower.

    Repair price: €2,168.20 including VAT: WC complete renovation €1,900, bidet shower installation €190 and travel costs to Kallavere for 5 days × €15.64 = €78.20.

    Duration of repair: 5 working days in 2024, including demolition 1, frame and pipes 1, partition and tiling 2 and toilet and sanitary shower 1 day.

  • Keila timber-house bathroom floor before the slope is built: boards screwed to joists, exposed joists at one edge, a tape measure and timber framing by the walls. Plywood sheet edges rest on joists so none are unsupported.

    Bathroom in a former pantry in a pre-war Keila wooden house

    Location: Keila, near Keila School.

    Job number: 1858, 6 wall photos were given to the customer with a warranty document.

    Volume and dimensions: 3.8 m² bathroom with wooden beams on the floor slab: slag filling out from between the beams, beams inspected, 22 mm moisture-resistant plywood, support beam next to two springy beams, 100 mm opening in the outer wall for a fan with humidity sensor, corner shower enclosure and WC.

    Repair price: €4,284.88 including VAT: small bathroom renovation €3,950 and Keila's travel expenses for 13 days × €25.76 = €334.88. Floor reinforcement with support boom and plywood is excluded from the starting price of 3,950 euros.

    Duration of repairs: 13 working days in 2025, including demolition and slag filling 2, beams, plywood and support beam 1, plumbing, electrical and vent 3, waterproofing 2, tiling 3 and sanitaryware installation 2 days.

  • Saue basement washroom during waterproofing, with dark grey coating and a yellow tape measure on the walls, insulation boards, buckets and rollers on the floor, and pipes overhead. The ceiling receives moisture-resistant, anti-mould paint.

    Basement washroom and sauna in a Saue garden city home

    Location: Saue, near Saue Gymnasium.

    Job number: 1 690, 9 wall photos were given to the customer with a warranty document.

    Volume and dimensions: 5 m² laundry room and 3 m² sauna in the basement, the floor is lower than the sewage pipe leaving the house: the humidity of the basement wall was measured before the quote, a 20 mm insulating building board on the ground side wall, a membrane on all walls up to 2 metres high, the wastewater pump was tested with 50 liters of water, the sauna extract ventilation directly outside.

    Repair price: €8,901.84 including VAT: laundry room at the price of construction of the shower room at €4,200, sauna at the price of construction of the apartment sauna at €4,470 and Saue travel cost for 14 days × €16.56 = €231.84. Basement wall drying and wastewater pump are excluded from the initial repair prices.

    Duration of repair: 14 working days in 2024, of which wall drying and insulating board 3, wastewater pump and drains 2, waterproofing 2, tiling 3, sauna frame and vapour barrier 2 and sauna panelling, heater and benches 2 days.

  • Floor-level shower beneath a sloping ceiling, with a linear drain by the wall, supported glass screen, large light grey floor tiles and a wooden stool with towels. The drain grate is taped during construction to keep mortar and tile adhesive out.

    Underfloor-heated shower area with linear drain in Peetri

    Location: Rae parish, near Peetri Kindergarten-Primary School.

    Job number: 1897, 3 wall photos were given to the customer with a warranty document.

    Volume and dimensions: 5.5 m² bathroom, shower area at floor level instead of a bath: 90 cm linear floor drain next to the wall, heating pipe 10 cm away from the floor drain body, screed moisture measured before the membrane, S1 class tile adhesive, glass wall next to the wall profile and ceiling support rod, movement joint under the doorway.

    Repair price: €4,246 including VAT: shower room construction €4,200 and Peetri's travel expenses for 5 days × €9.20 = €46.

    Duration of repair: 5 working days in 2026, of which demolition of the tub and tiles 1, slope and floor drain 1, membrane 1, tiling 1 and glass wall 1 day.

  • Guest shower room with large light grey tiles, a decorative tiled niche, glass screen, linear drain along the back wall and window to the right. Its walls are tiled from floor to ceiling.

    Two bathrooms in a Viimsi detached house

    Location: Viimsi, near Haabneeme School.

    Job numbers: 1924 and 1925, 9 wall photos were given to the customer with two warranty letters.

    Volume and dimensions: 9 m² master bathroom and 4 m² guest shower room with electric floor heating: the rooms were renovated in sequence so that the family used one washing place all the time, the resistance of the heating cables was measured before and after tiling, 60x120 cm tiles, a wall niche with patterned decorative tiles chosen by the customer and a dry-closing floor drain in the guest shower room.

    Repair price: The price of each room is calculated separately and added together, the installation of 60x120 tiles costs €58/m² and the Viimsi travel cost is 20 days × €11.96 = €239.20, one daily amount for both rooms.

    Duration of renovation: 20 working days in 2026, of which 13 days for the main bathroom and 7 days for the guest shower room.

Bathroom projects: scope, price and result

Each repair has the owner's first name and last initial, location, price including VAT, working days and the result of the finished room.

  • An installer in a grey T-shirt fixes a corner shower's glass above a low white shower tray; silicone guns, a drill and a level lie on yellow floor covering. The silicone joint is smoothed with a spatula dipped in soapy water.

    Low shower tray and glass corner enclosure in a Lasnamäe panel building

    Owner: Maie K., apartment with sanitary cabin on Lasnamäe. Location: near Lindakivi Culture Center, Lasnamäe. Job number: 1774.

    Repair price: €1054.30 including VAT.

    Duration of repair: 4 working days in 2025, of which 1 day for shower tray and drain, 1 membrane, 1 day for tiling and 1 day for corner shower enclosure.

    Finished room: The edge of the shower tray rises 40 millimetres from the floor and you no longer have to step over the high bottom of the old enclosure.

  • A round floor drain surrounded by dark grey membrane and white reinforcement strips after old tiles have been removed; a blue bucket and roller sit on protective sheeting. The old tile is cut out along the grout joints to preserve neighbouring intact tiles.

    Floor drain waterproofing repair in a Lilleküla apartment

    Owner: Ene P., apartment in a small apartment building in Lilleküla. Location: Near Löwenruh Park, Kristiine. Job number: 1619.

    Repair price: €302 including VAT.

    Duration of repair: 2 working days in 2024, including removal of the old tile and 1 patch, and 1 day of water testing and tiling after 24 hours of drying.

    Finished room: The joint between the floor drain and the floor is waterproof under the new cloth, and the warranty covers it for 3 years.

  • A tiler in dark work clothes presses a large light grey floor tile into combed adhesive; tiles lean against the wall, with a red space heater in the corner and snow at the window. Large tiles are stored upright so a stack's weight cannot crack the lower ones.

    Tiling a new bathroom near Saue Church with 60 × 60 cm tiles

    Owner: Kärt V., newly built private house in Saue. Location: Near Saue Church, Saue. Job number: 1912.

    Repair price: €1710.60 including VAT.

    Duration of repair: 5 working days in 2026, of which waterproofing with drying and water test 2 days and tiling and grouting 3 days.

    Finished room: The 23.2 square meter 60x60 tiles in the bathroom are in place and none of the tiles rattled in the knock test.

  • A carpenter in light grey work clothes drills the upper sauna bench, with pale lining on the walls and ceiling, an electric heater on the floor and a round wall vent. The wall boards run vertically so condensation drains down their grooves.

    Sauna with heat recovery in a Peetri terraced house

    Owner: Urmas H., terraced house with heat recovery in Peetri. Location: near Peetri's former windmill, Peetri, Rae parish. Job number: 1587.

    Repair price: €4506.80 including VAT.

    Duration of repair: 4 working days in 2024, of which frame and insulation 1, waterproofing and vapour barrier 1, sauna panelling 1 and heater and benches 1 day.

    Finished room: The extraction of the sauna is separate from the heat recovery device, and the 3 square meter sauna was heated to 80 degrees on the fourth business day.

  • Sauna with a foil vapour barrier and timber battens on the walls. An installer in a black hat tapes a ceiling corner from a low step; tied lining boards and a work lamp stand by the door, and the light cable passes through the barrier with a rubber seal.

    Renovating a 1990s apartment sauna near Pirita Harbour

    Owner: Elmar T., old apartment sauna in Pirita apartment building. Location: Near Pirita Harbour, Pirita. Job number: 1836.

    Repair price: €5120 including VAT.

    Duration of repair: 5 working days in 2025, of which demolition of the old sauna 1 day, frame and insulation 1 day, waterproofing and vapour barrier 1 day, sauna panelling 1 day and heater, benches and first heating 1 day.

    Finished room: The new 4.5-kilowatt heater heats the sauna to 80 degrees in 40 minutes, the old 3-kilowatt heater took 70 minutes.

  • An electrician in a dark blue T-shirt fits a junction box near the ceiling from a ladder; orange cable conduits, a mounting plate with two brass connectors and a high window are visible. In this old stone house, a detector checks for hidden pipes before cable channels are cut.

    Bathroom renovation in a Tõnismäe stone building

    Owner: Leida S., apartment in Tõnismäe settlement. Location: near the Estonian National Library, Tõnismäe district, Kesklinn. Job number: 1663.

    Repair price: €4730 including VAT.

    Duration of repairs: 12 working days in 2024, including demolition 2 days, plumbing and electrical 3 days, waterproofing 2 days, tiling 3 days and sanitaryware installation 2 days.

    Finished room: The bathroom was handed over on the 12th business day and its electrical circuit is behind its fault current protection.

  • A plumber in a dark blue work jacket kneels by a cast-iron riser with a new grey section joined by black rubber couplings; a white PEX pipe and work light are nearby. Rust and old mortar are wire-brushed from the pipe end before fitting a coupling.

    Bathroom renovation and riser replacement in Mustamäe

    Owner: Tarvo N., rental apartment on Mustamäe. Location: Near Tallinn Arte Gymnasium, Mustamäe. Job number: 1931.

    Repair price: €8,000 including VAT.

    Duration of repairs: 14 working days in 2026, including demolition 2, waiting for apartment association decision 2, plumbing and electricity 3, waterproofing 2, tiling 3 and sanitaryware installation 2 days.

    Finished room: The cracked section of the cast iron riser has been replaced and the new bathroom was ready on the 14th business day.

  • A plumber in grey work clothes squats by a wall-hung toilet frame fixed to timber posts, looking at a sheet of paper below it; plasterboard sheets and a work light stand nearby. The frame enclosure uses two layers of moisture-resistant plasterboard.

    Wall-hung toilet upstairs in a Haabneeme detached house

    Owner: Merit R., two-storey house in Haabneeme. Location: near Põhkkonna steps, Haabneeme, Viimsi parish. Job number: 1745.

    Repair price: €2104.80 including VAT.

    Repair duration: 5 working days in 2025, including demolition 1 day, frame and pipes 1 day, bulkhead and tiling 2 days, and toilet and fan 1 day.

    Finished room: The frame of the wall-mounted toilet supports 400 kilograms, and the paper under it remained dry overnight with pressurized pipes.

Request a quote

Call our Tallinn city centre office +372 XXXX XXXX
  • Licensed and insured
  • 100% satisfaction guarantee

Please enter your name and either a phone number or an email address.

Call our Tallinn city centre office +372 XXXX XXXX